Why is midtown tunnel closed




















The repaving work means drivers will benefit from a smoother and improved driving surface and clear newly striped lane marking lines. Motorists should allow extra time and use an alternate route if possible.

The MTA encourages motorists to sign up at www. Given the large number of vehicles that cross through the Queens Midtown Tunnel each day, the roadways in the tubes need to be repaved every few years to maintain a smooth driving surface.

The tubes were last repaved as part of the three-year effort to rebuild the tunnel after Superstorm Sandy, which was completed in July —nine months ahead of schedule. Close Menu. Search Search. We have detected you are using an out-of-date browser. The following streets will be closed Saturday, November 6, from 10 am to 6 pm for the Union Square Autumn Fair for full street closure. The following streets will be closed Thursday, November 11, from 11 am to 4 pm for the Veterans Day Parade for full street closure.

The following streets will be closed Thursday, November 11, from 10 am to 6 pm for the Veterans Day Festival for full street closure. At least one lane in each direction will be maintained at all times. The following streets will be closed Saturday, November 6, from 11 am to 4 pm for the Veterans Appreciation Parade for full street closure.

Single-lane in both direction will be closed Monday to Friday from 7 am to 3 pm and double-lane Bronx-bound will be closed Monday to Friday from 10 am to 2 pm to facilitate electrical work on the bridge.

Single-lane in either direction will be closed Monday to Friday from 9 am to 3 pm and double-lane will be closed from 10 pm to 6 am next morning. Double-lane will be closed Saturday and Sunday from 12 am to 5 am. The partial sidewalk closure is still in effect. Roadway will be partially closed and approximately 12 parking spaces will be removed on the bridge through December to facilitate bridge rehabilitation.

Traffic will be shifted to the south side of the bridge and north sidewalk will be closed. Single-lane on the north side of the bridge and north sidewalk will be closed and the vehicular traffic will be shifted to the south side. Approximately ten parking spaces on Park Avenue will be removed and bicycle traffic will be redirected. Single-lane eastbound Cross Island Parkway, between Exit 16 and Exit 35, will be closed Monday to Thursday from 11 pm to 5 am next morning, Saturday from 12 am to 9 am and from 11 pm to 10 am next morning.

Single-lane westbound Cross Island Parkway, between Exit 36S and the gore area of Whitestone Expressway, will be closed Monday to Thursday from 10 pm to 5 am next morning, Friday from 10 pm to 7 am next morning, and Saturday from 11 pm to 8 am next morning.

Single-lane in both direction will be closed Monday to Friday from 11 pm to 5 am next morning. Double-lane in both direction will be closed Monday to Thursday from am to 5 am and Saturday from 1 am to 6 am. One lane in both direction will be maintained at all times.

Saturday November 6, Friday November 12, This traffic alert details road construction and other events that will affect the flow of traffic this week. Check who operates bridges and tunnels Permits for parades, block parties, major street fairs and other public street events are not issued by NYC DOT, and are listed on the Citywide events calendar.

Brooklyn Bridge Pearl Street entrance ramp to Brooklyn Ramp B , will be closed Monday to Thursday from 11 pm to 5 am next morning and Friday from 11 pm to 7 am next morning. Manhattan Franklin D. Roosevelt Drive between East 53 Street and East 61 Street Northbound single-lane will be closed weekdays from 11 pm to am next morning, double-lane will be closed from 1 am to 5 am, and may be fully closed for fifteen minute intervals from 1 am to 5 am if the traffic queue is relieved.

Franklin D. Roosevelt Drive between East 68 Street and East 72 Street Single-lane in either direction will be closed weekdays from 11 pm to am next morning, Saturday from am to am, and Sunday from 1 am to 11 am. Frankfort Street between Pearl Street and Gold Street This street will be reduced to only single-lane in each direction until further notice to facilitate rehabilitation of the Brooklyn Bridge's approach arches.

Festivals, Parades and Events Veterans Appreciation Parade The following streets will be closed Saturday, November 6, from 11 am to 4 pm for the Veterans Appreciation Parade for full street closure.



0コメント

  • 1000 / 1000